201 - Abnormal Operating Conditions Related to
203 - Welding on Pipelines
204 - Visual Inspection of Welds not Non-Destructively Tested
205 - Non-destructive Testing (Dye Penetrant)
206 - Non-destructive Testing (Mag Particle)
207 - Measurement of Wall Thickness with Ultrasonic Device
208 - Non-destructive Testing (X-Ray)
209 - Plastic Pipe Joining: Butt Fusion
210 - Plastic Pipe Joining : Mechanical Joining
211 - Plastic Pipe Joining: Electrofusion
213 - Perform Plastic Fusion Inspection
214 - Joining of Metal Pipe and Components by means other than Welding - Threaded and Flanged Connections
215 - Joining of Metal Pipe and Components by means other than Welding - Threaded Connections
217 - Joining of Metal Pipe and Components by means other than Welding- Flanged Connections
301 - Small Diameter Metal Tubing and Fitting Installation
401 - Install Tracer (electrically conductive) Wire
406 - Examination of Buried Pipelines When Exposed
407 - Protection of Coating When Backfilling and From Below
412 - Conduct Test to Determine Cathodic Protection Current Requirements
413- Perform Cathodic Protection Survey
417 - Install CP Leads on Pipeline Using Exothermic Weld
421 - Anode Installation on Submerged Pipeline or Facilities
426 - Atmospheric Corrosion Monitoring
480 - Measurement of Depth of Pitting with Pit Gage
426 - Inspect Pipe Coating with Holiday Detector
480 -Apply Approved Coating by Hand Application
482 - Apply Approved Coating by Mechanical Spray and Hand Application Methods
484 - Apply Approved Coating by Wrap Application
501 - Conduct a Pressure Test
605 - Locate Line/Install Temporary Marking of Buried Pipeline
606 - Locate and Mark Submerged Pipelines
607 - Damage Prevention: Observation of Excavating and Backfilling (skill evaluation is now required)
616 - Atmospheric Monitoring during Hot Work Operations
617 - Locate Buried Facilities with an Electro-magnetic Device
618 - Install Temporary Marking of Buried Pipeline
619 - Damage Prevention During Vacuum
Excavation and Backfilling Activities
661 - Launching and/or Receiving Internal Devices (Pigs) (Internal)
703 - Placing/Maintaining Line Markers
741 - Installation and Maintenance of Casing Spacers, Vents, and Seals
900 - ROW Observance (Identifying Foreign Facilities)
901 - Hauling, Stringing and Handling Pipe
903 - Directional Drilling and/or Boring
904 - Inspection of Material
905 - Lowering Pipe into Ditch
906 - Rights-of-Way Cleanup
908 - Installation of Cathodic Protection
910 - Inspection of Construction Activities
911 - Depth of Cover Verification (line locating)